Resequencing Operations - CO02

$
0
0

I need to restructure operations for production orders that are already in production to maintain an accurate dispatch report.  Occationally I will have a order that needs additional operations added to it after production has started.  Operations for a normal production order go Op. 0010, Op. 0020, Op 0030, and so on. When I add operations, I want to add operations as operation Op. 7000, Op. 7010, Op. 7020 and so on.  However, I want them to make these operations show up first on the dispatch report.  So, if the order has completed everything from 0010 to 0050 and still has 0060 to 0160 to go, I want 7000, 7010, and 7020 to show up before 0060.  How can I do that?

 

~Amelia